PROJECTS
As an ongoing effort to produce excellence, the Barom Global Technologies Inc. has accommodated a series of projects:






•Overhauled / Commissioned of 50 Valve Meyer PET filler. Customer, Permanis, Malaysia
•Commissioned Metalnova PET filler Hot – fill. Suzhou China
•Commissioned 2 Meyer Bottle Filler Model 60-10 Zesto Corporation
•Upgraded Centering Devices Meyer Filler 72-20 Bottle Filler. Coca – Cola Calasiao Plant
•Upgraded / Commissioned Meyer Filler 72-12 Bottler Filler. Coca – Cola Ilagan Plant
•Overhauled / Upgraded Meyer Filler 60V. Coca – Cola Ilagan Plant
•Overhauled / Upgraded Mojonnier Carbo – Cooler and Flomix Model 14L56. Coca – Cola Ilgan Plant
•Overhauled Meyer Bottle Filler 72-12QT. Coca – Cola Naga Plant
•Upgraded Mojonnier Carbo – Cooler and Flomix Model L48. Pepsi Cola Zamboanga Plant
•Replaced all Lift Cylinders and Centering Devices with upgraded cylinders and centering devices Meyer Bottle Filler Model 40-10. Pepsi Cola Zamboanga Plant
•Overhauled / Repaired and Installed bottle and case conveyor assembly. Coca – Cola Ilagan Plant.
•Overhauled / Upgraded Mojonnier Carbo – Cooler and Flomix Model 28L36. Coca – Cola Cebu Plant
•Overhauled / Upgraded Mojonnier Carbo – Cooler 28M36. Coca – Cola Calasiao Plant
•Refrigeration Piping for 2 bottling lines. Coca – Cola Ilagan Plant
•Technical Assistance and Supervision for Filler Overhauling. Belle Mondo Corp. Novelino Wine
•Overhauled / Upgraded Mojonnier Model 28M56. Coca – Cola Calasiao Plant
•Overhauled / Installed Crowner Machine 10HD. Coca – Cola Ilagan Plant
•Overhauled complete lift cylinder assembly Meyer Bottle Filler 65V Coca – Cola Gen. Santos Plant
•Overhauled complete Filling Valve Assembly Meyer Bottle Filler 65V Coca – Cola CDO Plant
•Overhauled complete Filling Valve Assembly Meyer Bottle Filler 90V Coca – Cola Sta. Rosa Plant